More Transportation Thoughts
All of the problems with the Greenway are problems of implementation, and they are indicative of a complete lack of comprehensive transportation planning on the part of the City. Which really should not be a surprise to anyone. CB1 Transportation Chair Teresa Toro has been calling for a comprehensive transportation study for years. CB1 requested this during the 2005 rezoning, and was told it was not necessary. Every time the issue is raised, DOT says that existing transportation policy and infrastructure is adequate to meet our needs.
Chicken, meet roost.
The problem with Kent Avenue is not the Greenway. The problem is that DOT is asking Kent Avenue to do too much. They want Kent to be a two-way truck route, with existing manufacturing users on the east side of the street and new residential/commercial uses on the west side of the street. Add to that the temporary bike lanes (or the future Greenway), and there is just not enough room.
Read more
Labels: greenway, kent ave, transportation




0 Comments:
Post a Comment
<< Home